READ MORE ABOUT CDUStage 1: Assess and discover (1–3 weeks)
- Inventory servers, databases, applications, dependencies and owners. Azure Migrate can automate discovery.
- Classify each workload using the "6 Rs": rehost, replatform, refactor, rearchitect, retire or retain.
- Identify compliance obligations: the Privacy Act and Australian Privacy Principles, the Essential Eight, and any industry rules (APRA CPS 234 for financial services, health records legislation).
- Produce a business case with a realistic cost comparison, including licensing (Azure Hybrid Benefit) and what you'll save by retiring unused systems.
Stage 2: Design the landing zone (1–3 weeks)
A landing zone is the secure foundation every workload lands on. It should include:
- Management group and subscription structure, separating production, non-production and shared services.
- Hub-and-spoke or virtual WAN networking, with firewall, private endpoints and defined connectivity to on-premises.
- Identity through Microsoft Entra ID, with role-based access control and Privileged Identity Management.
- Region selection: Australia East (Sydney) and Australia Southeast (Melbourne) as a pair for resilience.
- Policy-as-code using Azure Policy, with infrastructure as code (Bicep or Terraform).
Stage 3: Build security and governance in, not on (parallel)
| Area | What to put in place |
|---|---|
| Identity | MFA, Conditional Access, least-privilege roles |
| Network | Segmentation, NSGs, Azure Firewall, no public endpoints by default |
| Data | Encryption at rest and in transit, Key Vault, backup and retention |
| Threats | Microsoft Defender for Cloud, Microsoft Sentinel |
| Governance | Azure Policy, tagging standards, budgets and alerts |
| Compliance | Mapping to Essential Eight and ISM where relevant |
Stage 4: Migrate in waves (2–8 weeks or longer)
- Start with a low-risk pilot workload to prove the process.
- Group applications into waves by dependency, not by team.
- Replicate, test, then cut over in an agreed window with a rollback plan.
- Validate performance, security and user acceptance before decommissioning the old system.
Stage 5: Optimise (ongoing)
- Rightsize VMs, use Reservations or Savings Plans, and shut down idle resources.
- Review the Azure Well-Architected Framework pillars: reliability, security, cost, operational excellence and performance.
- Plan autoscaling and disaster recovery targets (RPO and RTO) that match the business, rather than the maximum available.
Stage 6: Operate
Set up monitoring (Azure Monitor), patching, incident response and a monthly cost review. Decide whether you run this internally or through a managed service.
Common mistakes
- Lifting and shifting everything without checking which workloads should be retired or modernised.
- Building the landing zone after migration starts.
- Leaving cost governance until the first surprise bill.
- Ignoring data residency, including backups and logs.
- Underestimating licensing and egress costs.
FAQ
How long does an Azure migration take?
4–12 weeks for most small to mid-sized businesses, 3–6 months for enterprise or regulated environments.
Is my data kept in Australia?
Yes, if you deploy to Australia East or Australia Southeast and check backup, logging and any global services you use.
Lift-and-shift or re-architect?
Lift-and-shift is faster, while re-architecting usually delivers more long-term savings. Many projects do both, by workload.
Can we migrate without downtime?
Often yes with staged replication and a short cutover window, depending on the workload.